• About
  • Advertise
  • Privacy Policy
  • Contact
Over View - Your Daily News Source
  • Home
  • News
    • Business
    • Politics
    • Science
  • Lifestyle
    • Food
    • Travel
    • Health
    • Fashion
  • Entertainment
    • Entertainment
    • Sports
  • Tech
No Result
View All Result
  • Home
  • News
    • Business
    • Politics
    • Science
  • Lifestyle
    • Food
    • Travel
    • Health
    • Fashion
  • Entertainment
    • Entertainment
    • Sports
  • Tech
No Result
View All Result
Over View - Your Daily News Source
No Result
View All Result
Home News Business

Holcim supplies aggregates for Luton airport

admin by admin
July 11, 2026
in Business, News
0
Holcim supplies aggregates for Luton airport
0
SHARES
1
VIEWS

Resurfacing work at Luton, courtesy of Leo Hillier/LLA Media

Resurfacing work at Luton, courtesy of Leo Hillier/LLA Media

Holcim sourced 28,000t from its own Bardon Hill Quarry, with a further 7,000t from Garside Sands Aggregate Plant. Lagan Aviation used the aggregates delivered by Holcim to produce specially engineered Marshall asphalt, which it then applied to the runway for creating the new surfacing.

The planings removed from the old runway surface were transported to Holcim’s aggregate plant in Croft, to be recycled and used in its circular asphalt products.

The £18 million runway resurfacing programme, which began in November 2025 and was completed in March of this year, marks the first full renewal of the 1.3-mile runway since 2006. Under UK aviation safety requirements, major runways typically require resurfacing every 20 years to remain compliant and safe for aircraft operations.

Because London Luton Airport operates around the clock, the construction team worked within a nightly window of only five hours and 44 minutes before the runway was returned to service for the first departures of the morning. This limited access required meticulous planning, precise execution and consistent supply reliability.

Each night, approximately 15 centimetres of the existing surface was removed and replaced with a new high-performance asphalt layer engineered to withstand heavy aircraft loads and varying weather conditions throughout the year.

Got a story? Email news@theconstructionindex.co.uk

Read More

Previous Post

Caddick looks east

Next Post

Travis Perkins Managed Services appoints MD

Next Post
Travis Perkins Managed Services appoints MD

Travis Perkins Managed Services appoints MD

  • About
  • Advertise
  • Privacy Policy
  • Contact

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.

No Result
View All Result
  • Entertainment
    • Entertainment
    • Sports
  • Lifestyle
    • Fashion
    • Health
    • Travel
    • Food
  • News
    • Business
    • Politics
    • Science
  • Tech

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.