• About
  • Advertise
  • Privacy Policy
  • Contact
Over View - Your Daily News Source
  • Home
  • News
    • Business
    • Politics
    • Science
  • Lifestyle
    • Food
    • Travel
    • Health
    • Fashion
  • Entertainment
    • Entertainment
    • Sports
  • Tech
No Result
View All Result
  • Home
  • News
    • Business
    • Politics
    • Science
  • Lifestyle
    • Food
    • Travel
    • Health
    • Fashion
  • Entertainment
    • Entertainment
    • Sports
  • Tech
No Result
View All Result
Over View - Your Daily News Source
No Result
View All Result
Home News Business

AOM Residential/Hospitality: Coulter Place

admin by admin
October 31, 2026
in Business, News
0
AOM Residential/Hospitality: Coulter Place
0
SHARES
2
VIEWS

Coulter Place

Ardmore, Pa.

Award of Merit

Submitted by: Bozzuto Construction Co.

Owner: Kimco Realty

Lead Design Firm: JKRP Architects

General Contractor: Bozzuto Construction Co.

Civil Engineer: Langan Engineering

Landscape Architect: Mahan Rykiel Associates Inc.

Sustainability Consultant: MaGrann Consulting

Subcontractors: Santa’s HVAC; Telligent Masonry; Flooring Partners

What was once an underutilized site has been transformed into a dense, pedestrian-oriented mixed-use development with more than 130 market-rate residential units above a structured podium with 208 underground parking spaces, more than 10,000 sq ft of resident amenity space and approximately 20,000 sq ft of street-level retail. Located adjacent to one of the region’s most active mixed-use shopping and dining destinations, the project provides much-needed housing in a high-demand market while contributing to the city’s continued growth and vibrancy through thoughtful design, strategic density and strong integration with the surrounding community.

Limited staging areas and continuous activity surrounding the site demanded highly detailed phasing and logistics planning to prevent disruption to nearby businesses and public circulation. At the start of excavation, the originally scheduled earthwork dump site became unavailable. With more than 25,000 cu yd of material requiring haul-off, the team quickly identified and coordinated an alternate dump site, allowing earthwork operations to continue on schedule.

Read More

Previous Post

Tokenization issuance was phase 1, utility is phase 2

Next Post

ICE 2027 launches dedicated Indie Game Zone for emerging studios

Next Post
ICE 2027 launches dedicated Indie Game Zone for emerging studios

ICE 2027 launches dedicated Indie Game Zone for emerging studios

  • About
  • Advertise
  • Privacy Policy
  • Contact

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.

No Result
View All Result
  • Entertainment
    • Entertainment
    • Sports
  • Lifestyle
    • Fashion
    • Health
    • Travel
    • Food
  • News
    • Business
    • Politics
    • Science
  • Tech

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.