• About
  • Advertise
  • Privacy Policy
  • Contact
Over View - Your Daily News Source
  • Home
  • News
    • Business
    • Politics
    • Science
  • Lifestyle
    • Food
    • Travel
    • Health
    • Fashion
  • Entertainment
    • Entertainment
    • Sports
  • Tech
No Result
View All Result
  • Home
  • News
    • Business
    • Politics
    • Science
  • Lifestyle
    • Food
    • Travel
    • Health
    • Fashion
  • Entertainment
    • Entertainment
    • Sports
  • Tech
No Result
View All Result
Over View - Your Daily News Source
No Result
View All Result
Home News Business

AOM Small Project: Lake Marion Restoration

admin by admin
October 31, 2026
in Business, News
0
AOM Small Project: Lake Marion Restoration
0
SHARES
1
VIEWS

Lake Marion Restoration

Severn, Md.

Award of Merit

Submitted by: BayLand Consultants & Designers Inc.

Owner: Provinces Civic Association

Lead Design Firm and Civil Engineer: BayLand Consultants & Designers Inc.

General Contractor: Pay Dirt

Nonprofit Grantors: Seven River Association and Arundel Rivers Foundation

Subcontractors: Ashton Manor Environmental; Xylem US Inc; AB Consultants Inc.

The project culminated a 20-year community-led effort to restore the 3-acre detention pond that had sustained diminished ecological function. Removal of accumulated sediment restored the lake to its historical depth and reestablished a permanent pool up to 8 ft deep. Forebays were constructed at primary inflow points to capture sediment and reduce long-term maintenance requirements. A 20-ft to 30-ft-wide aquatic bench constructed around the lake perimeter and planted with native vegetation provides shallow water habitat, promotes nutrient uptake and transformation, stabilizes slopes and enhances overall ecological diversity. The bench also functions as a buffer to intercept sediment and pollutants prior to entering the main pool.

Reconstruction of the embankment required installation of a 14-ft-deep cutoff trench compacted to 95% to meet dam safety requirements. A temporary groundwater control system reduced inflow to normal levels, allowing for proper placement and compaction of materials while maintaining construction progress.

Read More

Previous Post

AOM Renovation/Restoration: Marine Barracks Washington Building 8

Next Post

WEEX Returns to TOKEN2049 Singapore 2026: Platinum Sponsor & AI Trading

Next Post
WEEX Returns to TOKEN2049 Singapore 2026: Platinum Sponsor & AI Trading

WEEX Returns to TOKEN2049 Singapore 2026: Platinum Sponsor & AI Trading

  • About
  • Advertise
  • Privacy Policy
  • Contact

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.

No Result
View All Result
  • Entertainment
    • Entertainment
    • Sports
  • Lifestyle
    • Fashion
    • Health
    • Travel
    • Food
  • News
    • Business
    • Politics
    • Science
  • Tech

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.